TRITON T80 EASI-FIT INSTALLATION AND OPERATING INSTRUCTIONS MANUAL Pdf Download (2024)

TRITON T80 EASI-FIT INSTALLATION AND OPERATING INSTRUCTIONS MANUAL Pdf Download (1)
  1. Manuals
  2. Brands
  3. Triton Manuals
  4. Shower heater
  5. T80 Easi-fit
  6. Installation and operating instructions manual

Hide thumbs

1
2
3
4
Table Of Contents 5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
26
27
28
29
30
31
32
  • Contents
  • Table of Contents
  • Troubleshooting
  • Bookmarks

Table of Contents

  • Table of Contents

  • Specifications

  • Electrical Requirements

  • Installing the Shower
  • Siting of the Shower

  • Plumbing Installation

  • Electrical Installation

  • Fitting the Cover

  • Commissioning Procedure

  • User Operating Instructions
  • Operating Functions

  • Fault Finding/Troubleshooting
  • Spare Parts

  • Shower Controls - Quick User Guide

  • Service Policy/Uk Guarantee

Advertisem*nt

Quick Links

  • 2 Installing the Shower
  • 3 Plumbing Installation
  • 4 Commissioning Procedure
  • 5 User Operating Instructions
  • 6 Fault Finding/Troubleshooting
  • Download this manual

T80 Easi-fit +

electric shower

Installation and

instructions

I

nstallers please note these InstructIons

are to be left wIth the user

The showerhead and hose supplied with this product are an integral

part of the safety of your shower. Failure to use genuine Triton

parts may cause injury and will invalidate your warranty

EC Registered Design No.

001902388-0005 to 0007

operating

2181509A - Nov 2016

Patents Pending: GB 2489547

GB 2495343

Patent: GB 2481878

Table ofContents

NextPage
  • 1
  • 2
  • 3
  • 4
  • 5

Advertisem*nt

Table of Contents

TRITON T80 EASI-FIT INSTALLATION AND OPERATING INSTRUCTIONS MANUAL Pdf Download (2)

Summary of Contents for Triton T80 Easi-fit

  • Page 1 The showerhead and hose supplied with this product are an integral part of the safety of your shower. Failure to use genuine Triton parts may cause injury and will invalidate your warranty Patents Pending: GB 2489547 EC Registered Design No.
  • Page 2 INTRODUCTION - PLEASE READ PLEASE READ THIS IMPORTANT SAFETY INFORMATION Products manufactured by Triton are safe and without risk provided they are installed, used and maintained in good working order in accordance with our instructions and recommendations. WARNING: DO NOT operate shower if frozen, or suspected of being frozen. It must thaw out before using.
  • Page 3 DO NOT operate the shower if water ceases to flow during use or if water has entered inside the unit because of an incorrectly fitted cover. WARNING: If restarting the shower immediately after stopping, be aware that a slug of IMPORTANT - GENERAL GUIDANCE NOTES hot water will be expelled for the first few seconds.
  • Page 4 GENERAL ADVICE TO USERS IMPORTANT ADVICE TO USERS The following points will help you understand how the shower operates: a. The electric heating elements operate at a COMISSIONING ADVICE constant rate at your chosen power setting. It is the rate of the water passing through When first installed the unit will be empty.
  • Page 5: Table Of Contents

    Spare parts ................22 - 23 SHOWER CONTROLS - QUICK USER GUIDE ....Inside rear cover UK Service Policy/UK Guarantee ..........Rear cover To check the product suitability for commercial and multiple installations, please contact Triton’s specification advisory service before installation. Telephone:...
  • Page 6: Specifications

    SECTION check list SPECIFICATIONS ELECTRICAL Nominal power - rating at 240V Nominal power - rating at 230V 8.5kW – (40A MCB rating) 7.8kW – (40A MCB rating) 9.5kW – (40A MCB rating) 8.7kW – (40A MCB rating) 10.5kW – (40A MCB rating) 9.6kW –...
  • SECTION DIMENSIONS & ENTRY POINTS check list Fig.1 DIMENSIONS 225mm 101mm Fig.2 ENTRY POINTS = Back = Others WATER Left: Bottom, Back, Top & Side. Right: Bottom, Back, Top & Side. = Back = Others CABLE Left: Bottom, Back & Top. Right: Bottom, Back &...
  • Page 8: Electrical Requirements

    SECTION ELECTRICAL REQUIREMENTS check list ELECTRICAL REQUIREMENTS Triton Showers, Fig.3 Triton Road, Nuneaton, Warwickshire, CV11 4NR WARNING! W-006-A xxxx THIS APPLIANCE MUST BE EARTHED The installation, supply cable and circuit protection must conform with BS 7671 (IEE wiring regulations) and be sufficient for the amperage required.
  • Page 9 SECTION Continued A 45 amp double pole isolating switch with 9.3 In any event, it is essential that individual a minimum contact gap of 3 mm in both site conditions are assessed by a competent poles must be incorporated in the circuit. electrician in order to determine the correct cable size and permissible circuit length.
  • Page 10: Installing The Shower

    SECTION check list Installation - SITING OF THE SHOWER SITING OF THE SHOWER Mains electric supply The installation must be in accordance with (via double pole switch) Water Regulations/Bylaws - see page 2 for water specifications • If it is intended to operate the shower at pressures above the maximum or below the Double minimum stated, contact Customer Service...
  • Page 11 SECTION Continued IMPORTANT: Water regulations (fig.6) WARNING • It is required that the showerhead be The shower MUST NOT be ‘constrained by a fixed or sliding attachment positioned where it will be so that it can only discharge water at a point subjected to freezing conditions.
  • Page 12: Plumbing Installation

    SECTION check list Installation - PLUMBING INSTALLATION PLUMBING INSTALLATION IMPORTANT INFORMATION Plumbing to be carried out before wiring The outlet of the shower acts as a vent • DO NOT use jointing compounds on any and must not be connected to anything pipe fittings for the installation.
  • Page 13: Electrical Installation

    SECTION check list Installation - ELECTRICAL INSTALLATION ELECTRICAL INSTALLATION NOTE: Deviations from the designated entry IMPORTANT: Switch off the electricity supply at the mains before proceeding. points will invalidate product approvals. The cable entry points are listed on page 3. •...
  • Page 14 SECTION Continued The backplate has removable top trims (top left Fig.9 and top right) that may be used for pipe entry Top pipe trims and two additional sections (top left and top right) that may ONLY be used as a ‘cut out’ for top electrical cable entry (fig.9).
  • Page 15 SECTION Continued • Remove the unit from the wall. Drill and Fig.10 plug the wall. (An appropriate drill bit should be used. If the wall is plasterboard or a soft building block, appropriate wall plugs should be fitted). • Screw the top fixing screw into position leaving the base of the screw head protruding 6mm out from the wall.
  • Page 16 SECTION Continued Fig.11 DO NOT DISCONNECT THE TOP WIRES Terminal Terminal block in block in left hand right hand entry entry position position Earth Earth terminal 1 terminal 2 Terminal block - left or right entry • Install the Earth cable to Earth terminal 1 or 2 to match the left or right Terminal block The Terminal block is factory assembled as a position.
  • Page 17: Fitting The Cover

    SECTION Continued • (fig.12) shows a schematic wiring diagram. IMPORTANT: When connecting the cable fully tighten the terminal block screws and make sure that no cable insulation is trapped under the screws. Loose connections can result in cable overheating. NOTE: The supply cable earth conductor must be sleeved.
  • Page 18 SECTION Continued FITTING THE COVER - continued Figures 13, 14, 15 and 16 show the correct control knob position when replacing the cover. A. With the cover off the shower - turn the POWER selector spindle clockwise until the flat section is on the left hand side (fig.13).
  • Page 19: Commissioning Procedure

    SECTION !! IMPORTANT !! COMMISSIONING check list WARNING Fig.17 Power selector Before normal operation of the shower, it to COLD is essential the following commissioning procedure is completed correctly. COMMISSIONING PROCEDURE The first operation of the shower is intended to flush out any remaining unit debris, and to make sure the heater unit contains water before the elements are switched on.
  • Page 20: User Operating Instructions

    SECTION check list USER OPERATING INSTRUCTIONS OPERATING THE SHOWER - (fig.19) Fig.19 Power selector Make sure the commissioning procedure has been carried out. To start the shower • Press the Start/Stop button and water will flow. High Cold To stop the shower •...
  • Page 21 SECTION Continued To adjust the shower temperature - Economy and High settings only • The water temperature is altered by increasing or decreasing the flow rate of the water through the shower via the temperature control (fig.19). • After obtaining your showering temperature, the knob can be left as the normal setting and should only need altering to compensate for seasonal changes in ambient water...
  • Page 22: Operating Functions

    SECTION Continued OPERATING FUNCTIONS Fig.20 Power on indicator (fig.20) When the electricity supply to the shower is switched on at the isolating switch, the neon in the START/STOP button will illuminate. TP – Temperature Protection During normal operation if the temperature exceeds the showering safety limit the power Low pressure to the elements will be removed completely,...
  • CLEANING THE FILTER Instructions for installers and service engineers only INSTRUCTIONS FOR INSTALLERS AND SERVICE ENGINEERS ONLY Instructions for installers and service engineers only CLEANING THE FILTER It is recommended that the filter is periodically cleaned in order to maintain the performance of the shower.
  • Page 24: Fault Finding/Troubleshooting

    3.1.1 See 'Water too hot' causes 2.1, 2.2 and 2.3 temperature temperature limiter. and their appropriate action/cures. If it cycling hot/cool continues contact Triton Customer Service. at intervals. 4 Water too cool 4.1 Too much flow. 4.1.1 Reduce flow rate via temperature control.
  • Page 25 Action/Cure 4 Water too cool 4.4 Electrical 4.4.1 Have unit checked by suitably qualified or cold. malfunction. electrician or contact Triton Customer (continued) Service. 4.5 Safety cut-out 4.5.1 Thermal safety cut-out device has operated. operated. Have the unit checked by a suitably qualified engineer or contact Customer Service.
  • Page 26: Spare Parts

    SPARE PARTS Images are for reference only - due to continual development, supplied spares may have modified appearance...
  • Page 27 SPARE PARTS SPARE PARTS Ref. Description Part No. Model Inlet Filter Assembly ....P82800843 Start/stop switch Assembly ..P81901342 Heater Can Assembly ....8.5 kW ....83314800 9.5 kW ....83314810 10.5 kW ....83314820 Switch Carriage Assembly ..P22611001 Pressure Switch Module .....P22611003 Trimplate ........7054303 Terminal Block and Wires ...S82201190 Outlet Pipe Assembly ....S85000260 Micro switch (set of 2) ....83314900 10.
  • Page 30 WEEE Directive – Policy Statement As a producer and a supplier of electric showers, Triton Showers is committed to the protection of the environment via our own environmental policy and the compliance with the WEEE directive. Triton Showers is fully registered with the Environment Agency under the following schemes:...
  • Page 31: Shower Controls - Quick User Guide

    SHOWER CONTROLS - QUICK USER GUIDE To START or STOP your shower. The power light will illuminate. To start the shower, press the Start/Stop button. To STOP the shower - press the Start/Stop button, then turn the Turn the isolator switch OFF. main power isolator switch ON To alter the FLOW and Temperature of your shower - HEAT SETTINGS ONLY.
  • Page 32: Service Policy/Uk Guarantee

    Warwickshire CV11 4NR E-mail: serviceenquiries@tritonshowers.co.uk Triton is a division of Norcros Group (Holdings) Limited Extended Warranty AVAILABLE NOW. Call 02476 378495 for more details. 15-12-16 TRITON reserve the right to change product specification without prior notice. E&OE. © TRITON SHOWERS 2016...
TRITON T80 EASI-FIT INSTALLATION AND OPERATING INSTRUCTIONS MANUAL Pdf Download (2024)
Top Articles
Latest Posts
Article information

Author: Chrissy Homenick

Last Updated:

Views: 6288

Rating: 4.3 / 5 (74 voted)

Reviews: 89% of readers found this page helpful

Author information

Name: Chrissy Homenick

Birthday: 2001-10-22

Address: 611 Kuhn Oval, Feltonbury, NY 02783-3818

Phone: +96619177651654

Job: Mining Representative

Hobby: amateur radio, Sculling, Knife making, Gardening, Watching movies, Gunsmithing, Video gaming

Introduction: My name is Chrissy Homenick, I am a tender, funny, determined, tender, glorious, fancy, enthusiastic person who loves writing and wants to share my knowledge and understanding with you.